Customization: | Available |
---|---|
After-sales Service: | One Year |
Warranty: | One Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High Precision Machining:
Efficient Production:
Multi-process Integration:
High Flexibility:
Reliability and Stability:
Project | ||
Processing references | Maximum machining diameter | Φ20mm |
Maximum machining length | 190mm | |
Maximum axial bore diameter | Φ10mm | |
Maximum axial work wire size | M8 | |
Maximum spindle speed | 10000rpm | |
Radial maximum bore diameter | Φ7mm | |
Radial maximum bore tapping size | M6 | |
Radial power head maximum rotation speed | ER11:10000/ER16:8000 | |
Rated speed of radial power head | ER11:8000/ER16:6000 | |
Maximum workpiece removal length | 100mm | |
Tool dimension |
Number of knives installed | 6 |
Tool (turning tool) | 12X12 | |
sleeve | Φ25.0 X 4 | |
Clip head guide sleeve | Spindle spring collet | TSUGAMI B0205CCR |
Power head collet | ER11,ER16 | |
Guide bushing | TSUGAMI BS-20#-B | |
Feeding speed | Z1/Y-axis feed velocity | 30m/min |
X1 | 20m/min | |
Electric motor | Spindle drive power | 2.5/3.7KW |
Power head drive power | 1KW | |
For cutting fluid | 0.4KW | |
Cooling of spindle | 0.075KW | |
Lubricating oil | 0.01KW | |
Others | Spindle center height | 1060mm |
Barometric flow | 0.7mpa 0.5m³/min | |
Main circuit breaker capacity | 40A | |
Input power | 9.3KW | |
Weight | 2.6T | |
Overall dimensions | 2250X1200X1850mm |
HS-320 basic structureSome Samples display
Pls contact us and send your drawings for accomendation of our suitable cnc machine
Exhibition hall&Factory
Our full range of services to meetcustomer reauirements forhighprecision products, Our professional team will advise you in advance onall aspects of design, manufacturing, and final asserbly, and assist youwith desian modifications during the production period, thereby helpingyou shorten the cyde from development to market. As soon as theproject starts, you don't have to wait. Our advantage is that efficient andprofessional
communication and cuick response make complex designand production comfortable and simple.
Some pictures about delivery
Foreign customers visit the company
Good seller reviews & second repurchase
Exhibition photos
Company's other inspection and processing equipments
Certifications
Q&A
1: How to select machine tools?
A: For selection, please send us the drawing of the turned part, our engineers will evaluate the drawing and provide the CNC lathe configuration that suits your needs.
2: What are your main products?
A: SmartLathe has concentrated all its resources to successfully develop the HS series of Swiss CNC lathes, including HS-820, HS-926, HS-320, HS-512 and CNC machines.
3: Where is our factory located? How to visit?
A: Our factory is located in Dalang Town, Dongguan City, Guangdong Province, China. We warmly welcome you to visit our factory.
4: What are the trade and payment terms?
A: FOB, CFR, CIF and EXW are acceptable. t/t, l/c, d/p.
5: What is the maximum order quantity?
A: 1 set. If you order more, we will offer you more favourable price.
6: What is the delivery time?
A: Full range of standard models are in stock. As for customisation, it depends on the situation.
7. Do you have any certificates?
A: Yes, our machines are CE compliant and our factory is ISO 9001 certified.
8. How long is the warranty period?
A: The warranty period is normally 12 months after the bill of lading date. 9.
9. Machine installation.
A: If the buyer requests, we can assign technicians to install on site.
10. Technical support
A: We provide technical response within 12 hours and troubleshooting solution within 48 hours.