Customization: | Available |
---|---|
Standard: | GB |
Surface Treatment: | Spray Paint |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Free selection of accessories
Fixed guide sleeve device | Workpiece recovery belt |
Material slag conveyor belt | Cutting oil flow monitoring device |
Rear tool table rotating tool drive device | End face rotating tool |
Double-end face rotary tool | Automatic feeder |
Deep hole gun drill system |
Product Information
Project | |||
Processin
referencesg references |
Max machining diameter | Φ20mm | |
Max machining length | 190mm | ||
referencesg referencesAxial maximum drilling diameter |
Φ10mm | ||
Maximum axial tapping size | M8 | ||
Maximum spindle speed | 10000rpm | ||
Radial maximum drilling diameter | Φ7mm | ||
Maximum radial tapping size | M6 | ||
Maximum speed of radial power head | ER11:10000/ER16:8000 | ||
Rated speed of radial power head | ER11:8000/ER16:6000 | ||
Maximum extraction length of workpiece | 100mm | ||
Tool size | Number of knifes installation | 6 | |
Tool (turning tool) | 12X12 | ||
Sleeve | Φ25.0 X 4 | ||
Collet guide sleeve | Spindle spring collet | TSUGAMI B0265CCR | |
Power head collet | ER11,ER16 | ||
Guide sleeve | TSUGAMI BS-20#-B | ||
Feed rate | Z1/Z2/X2/Y Z1/Z2/X2/Y-axis feed speed |
30m/min | |
X1 | 24m/min | ||
electrical machinery | Spindle drive power | 2.5/3.7KW | |
Power head drive power | 1KW | ||
For cutting fluid | 0.4KW | ||
For spindle cooling | 0.075KW | ||
For lubricating oil | 0.01KW | ||
Others | Spindle center height | 1060mm | |
Barometric flow rate | 0.7mpa 0.5m³/min | ||
Main circuit breaker capacity | 40A | ||
Input power | 9.6KW | ||
Weight | 2.6 | ||
Overall size | 2250X1200X2000mm |
Factory
Certifications
Q&A
1. What are your main products?
A. We specialise in Swiss-type CNC lathes for machining small, complex and precise metal parts.
2.How to choose the most suitable machine?
A: Send us the product drawing and application, we will choose the most suitable machine for you.
3. What is your delivery time?
A: Generally speaking, it takes 1-3 months according to different quantities.
4. What is the payment method?
A: Our payment method is T/T, L/C, D/P.
5. What are the shipping terms?
A: Ocean freight, train, truck, air freight (metal parts samples).
6. What are the delivery terms?
A: EXW/Shenzhen, FOB/Shenzhen, CIF/Shenzhen, CFR/Shenzhen.
7.Where is your factory? How to visit?
A: Our company is located in Dalang, Dongguan, Guangdong. We warmly welcome you to visit us.